Monmouthshire County Council is implementing traffic management systems on the Gilwern Viaduct following a recent monitoring assessment which revealed structural concerns.
To safeguard public safety and maintain the bridge’s continued operation, immediate remedial actions are being undertaken.
The following traffic measures will be implemented on the bridge from Monday, 19 January, until further notice:
- Weight Restriction: The bridge will have a 3.0 tonne weight limit.
- Lane Reduction: Traffic will be reduced to a single lane running across the bridge. Temporary traffic lights will manage traffic.
- Pedestrian access: Pedestrians will still be able to use the bridge.
These precautionary measures are crucial to reduce stress on the bridge and ensure the safe passage of all vehicles.
The Council is collaborating with specialist consultants to formulate both medium-term and long-term solutions to resolve the identified structural issues.
The condition of the bridge and the effectiveness of the traffic management measures will be continuously monitored throughout this time.
At present, no completion date can be confirmed, with the new traffic management arrangements anticipated to remain in effect for an extended period.
Cllr Catrin Maby, Monmouthshire County Council’s Cabinet Member for Climate Change and the Environment: “We understand that these restrictions may cause inconvenience to the local community. These temporary measures are essential to protect the integrity of the Gilwern Viaduct as we work towards a comprehensive and long-term solution. We appreciate the public’s patience and cooperation during this important period of remedial action.”
New 3,000-home town idea sparks concerns as group set up to fight plan
New nature-rich public space for Hereford
Herefordshire plans council tax rise and spending cuts
Health and safety ‘breach’ at Hereford timber firm
New roads contractor for Herefordshire named
Hereford city shop could lose licence
Hereford man charged following hoax calls to police
Ofsted hails ‘vast improvements’ at children’s services