Llanhedric Bridge, will be closed to traffic from 31 October to 9 November [2022] for repair work. The normal working hours will be between 8am and 4pm.
The bridge carries an unclassified road over the river Unk, from Bicton to Shadwell crossroads.
The work will involve removal of vegetation to the structure and masonry repairs to the downstream parapet.
To carry out the proposed work safely it will be necessary to close the bridge to vehicular traffic.
When the bridge is closed, traffic will be diverted via local roads by a signed diversion route.
Access over the bridge for pedestrians and dismounted cyclists will remain available throughout the proposed work.
There will be some disruption during these works, and people are thanked in advance for their understanding.
The work will be carried out by Shropshire Council’s term maintenance contractor Kier, with supervision being provided by WSP on behalf of Shropshire Council.
City referral school to be fenced in.
Turf cutting ceremony marks major milestone for Aylestone School.
A journey across the Atlantic to reconnect with family history.
Man charged following assaults in Hereford.
Man charged with wounding in Worcester.
Slow Food Christmas Fiesta Celebrates Artisans and Local Provenance at Ludlow Castle, 28th Nov.
Man arrested following stabbing in Worcester.
Farming, flooding and funding: Herefordshire conference to explore the future of our rivers.