Clun No 2 Bridge will be temporarily closed for repairs next week.
Proposed bridge repair work starting on Friday 22 July 2022 will require the temporary closure of Clun No 2 Bridge, which carries an unclassified road over a tributary of the river Clun, along Woodside Farm Junction to the Waterloo Lane end of Clun.
The work is expected to take up to three weeks, with working hours between 9.30am and 4pm Mondays to Fridays. The work will involve repairs to the downstream parapet and general repointing.
In order to carry out the proposed work safely it will be necessary to close the bridge to vehicular traffic. When the bridge is closed, traffic will be diverted via local roads by a signed diversion route.
Access over the bridge for pedestrians and dismounted cyclists will remain available throughout the proposed work.
Appeal to locate Herefordshire man who failed to appear at court
Traders frustrated as road closure extended
Wins for local firms among new highways contracts
Hereford restaurant seeks licence again
Scam websites posing as Hereford firm shut down
Farm plans fourth poultry shed
Free 30-minute parking scheme launches in Herefordshire
Prolific shoplifter jailed for Herefordshire offences